Skip to Content
Forms and Permits

FAQs For No Contact Permits

The City of Darien is still accepting permits/contractor licenses and scheduling inspections, at this time.  Permits can be dropped off to our correspondence box, within the first set of doors, at City Hall.
Application for Building /Public Works Permit
Contractor License Application
  1. Fence permits – Need Plat of Survey marking where the fence is going and the proposal from the fence company. If you are dropping off at correspondence box at City Hall, please attach a $25 check made payable to City of Darien.
  2. Roof permit – Please complete the Building Permit application and include the contractor who will be replacing the roof. The roofing contractor will need to be licensed with the City of Darien. I will need a Contractor License application and their state license. If you are dropping off at City Hall, in the correspondence box, please attach a $50 check.
  3. Contractor License – All contractor licenses expire at the end of April, unless you have recently renewed. If you are dropping off at City Hall, in the correspondence box, please attach a $60 check (Please note, ROOFING & PLUMBING contractors do not pay a fee they only need to submit their State License.
  4. Driveway/Patio/Sidewalks – Please complete the Building Permit application, along with your Plat of Survey, mark what area you are replacing or widening, and include what contractor will be doing the work.  If the homeowner is doing the work, list homeowner as contractor on second page.
    You can include a 250 check for driveway replacement ($175 will be refunded after the inspections have passed) Patio/sidewalk permit is $50.
  5. Swimming Pools – Please complete the Building Permit application, attach your Plat of Survey, marking where the pool will go, read and sign the attached and submit with the permit and include the brochure and specs on the pool with the permit.
    The contractor installing the pool will need to be licensed with the City of Darien. Fees will be determined after it goes for Plan Review.
  6. Sheds -  Please complete the Building Permit application, include your Plat of Survey, marking where the shed will go, and the specs from where you bought the shed along with a check for $115.   The contractor, if homeowner, list homeowner as contractor,  installing the shed will need to be licensed with the City of Darien.
     
    ALL CHECKS SHOULD BE MADE PAYABLE TO CITY OF DARIEN


Forms and Permits are arranged by Department:

Administration

Cable TV

Community Development

Government

Police

Tax Forms